Thank to our helpful punggol lodge neighbour frm Blk 603B (upper storey) who did a video clips on the layout of his house, which is having similar layout as us.
Tuesday, October 19, 2010
Monday, October 18, 2010
HLE Approved Date
HDB has processed your application. You will be receiving the HLE letter by mail.
HLE Approved Date 18 Oct 2010
HLE Expiry Date 17 Apr 2011
Monday, October 11, 2010
HLE Update 11th Oct 2010
Received HLE letter on 7th Oct 2010. Submission of Loan Assesment on 9th Oct 2010. Change of status update today, stating that doc was well receieved. Awaiting for the documentation verification and key collection in 1-2mths time.
Sunday, October 10, 2010
October 2010 Development
Saturday, October 9, 2010
October 2010 Development
1st batch of Key Collection from Blk 603A. Went for site visiting yesterday on 8Th Oct 2010 (sat) and managed to take a peek on the other design layout different frm ours .. all thanxs to the contractor loitering at the void deck, who was willing to bring us up! They have a better kitchen compared to ours. But we will be having a better view in living room. There are pros and cons in both designs. Good luck loh! well, received the HLE letter on 7th oct 2010. Think soon it will be our turn on key collection! Probably on 1 to 2mths time.
Blk 603A (1st Batch with key collection)
Living Room
Kitchen
Masterbed room
BedRoom 1
Common Toilet
Toilet 2
Toilet 2
Blk 603A (1st Batch with key collection)
Living Room
Kitchen
Masterbed room
BedRoom 1
Common Toilet
Toilet 2
Toilet 2
Thursday, October 7, 2010
Status Update On HDB Website
Application Status
The Probable Completion Date of your new flat is end Dec 2010. HDB will invite you to take possession of the flat when the construction of the flat is completed.
HLE Status Application
We would need to see some documents before we can assess your eligibility for an HDB loan. Please refer to the letter we sent to you by mail for the list of documents required.
The Probable Completion Date of your new flat is end Dec 2010. HDB will invite you to take possession of the flat when the construction of the flat is completed.
HLE Status Application
We would need to see some documents before we can assess your eligibility for an HDB loan. Please refer to the letter we sent to you by mail for the list of documents required.
Monday, October 4, 2010
Subscribe to:
Posts (Atom)